top of page

University of Iowa Restroom Full Flake Transformation

This project gave us a great opportunity to show the full process across several restroom areas at the University of Iowa. We started with mechanical grinding and careful surface preparation, completed the cove work along the walls, and then installed the full flake flooring system with a protective topcoat. Taking the time to complete each step carefully made a real difference in the final result.
Tipo de proyecto
Full Flake Institutional Restroom Flooring
Fecha
July 2026
Ubicación
Iowa City, Iowa
bottom of page